100A to 200A panel upgrades, start to green tag

Most older East Bay homes were built for lights, a fridge and a few outlets. EV chargers, heat pumps, induction ranges and remodels push them past what 60A or 100A service can safely carry.

A service upgrade replaces the meter and main panel, brings grounding and bonding to current code, and usually needs PG&E to rework the connection. We run the whole thing: load calculation, permit, PG&E application, one day of power-off work, and the inspection.

Estimate your timeline

Three answers, then a planning timeline for your city.

1Where is the home?
2What do you need?
3What service do you have now?

Your timeline appears here once all three are answered.

Only slightly over capacity? A load-managing smart panel can sometimes avoid a service upgrade. See when a smart panel is the better choice.

The four steps

  1. 1

    Load calculation

    We measure what the home draws today and what it will draw after EVs, heat pumps or remodels, and size the service to match.

  2. 2

    PG&E service planning

    We pull the permit and file the PG&E application, then coordinate the disconnect date for overhead or underground service.

  3. 3

    Heavy-up and grounding

    New meter main or panel, service entrance, and grounding and bonding brought to current code, usually in one working day.

  4. 4

    Green tag and reconnection

    We meet the inspector, get the green tag, and PG&E restores power to the new service.

Panel upgrade questions

How long does PG&E take on a 200 amp panel upgrade?

It depends on whether your service is overhead or underground and whether PG&E needs to change anything on their side. A straightforward overhead upgrade usually moves in weeks; underground services or transformer work can take longer. We submit the PG&E application early and coordinate the disconnect and reconnect so you're without power for one day of work.

How much does a 100A to 200A panel upgrade cost in the East Bay?

The main cost drivers are whether the panel stays in place or moves, overhead versus underground service, grounding and bonding corrections, and whether stucco, siding or drywall needs opening. We give a fixed written price after a free site visit, including permit and PG&E coordination.

Do I need a 200 amp upgrade to add an EV charger or heat pump?

Not always. A load calculation under the electrical code shows what your existing service can carry. If you're close, a load-managing smart panel or circuit-level load management can let you add the new equipment without upgrading the service.