Do you need a panel upgrade for an EV charger?

By Ally Electric & Solar, family-owned in Richmond since 2002

Short answer

Not always. A Level 2 charger needs a dedicated 240-volt circuit, and whether your existing service can carry it depends on a load calculation, not on the panel's size alone. Many 200A homes have room; many 100A homes with gas heat can fit a charger set to a lower amperage; homes already near their limit need load management or a service upgrade.

A new EV is one of the most common reasons East Bay homeowners call us about their panel. Here's how to tell whether your home can take a charger as it is, and what the options are if it can't.

What a Level 2 charger asks of your panel

Level 2 chargers run on 240 volts, like a dryer or range. Most can be set to draw anywhere from about 16 to 48 amps, and the circuit has to be sized above the charging current because the electrical code treats EV charging as a continuous load. A charger set to 48 amps needs a 60-amp circuit, for example.

That circuit needs two open spaces in the panel and enough capacity left in the service to carry it on top of everything else the house uses.

How a load calculation decides it

An electrician adds up the home's existing loads using the method in the electrical code, or uses a year of your PG&E demand data where it's available, then checks how much capacity is left. That number, not the label on the panel, tells you which charger setting fits.

Homes with gas heat, a gas range and a gas water heater often have more room than people expect. Homes that already have electric heat, an electric range or a heat pump usually don't.

Options short of a full service upgrade

Set the charger lower. Most drivers charge overnight, and a charger at 24 or 32 amps still refills a typical daily commute in a few hours.

Add load management. A load-managing device or a smart panel can pause the charger when the dryer or oven runs, so it fits on the existing service. Whether that's allowed for your specific setup is decided under the code and by the city inspector.

Upgrade the service. If you're also planning a heat pump, induction cooking or solar with a battery, a 200A upgrade done once is often cheaper than solving each project separately.

Plan for what comes after the EV

The charger is often the first of several electric appliances. If you expect to add a heat pump or switch to induction in the next few years, include those in the load calculation now so you only open the panel once.

Common questions

Can I install an EV charger on a 100 amp panel?

Often, yes, if a load calculation shows enough spare capacity, usually with the charger set to a lower amperage or paired with load management. Homes that already run electric heat or cooking on a 100A service usually need a service upgrade first.

Does a Level 1 charger need a panel upgrade?

Rarely. A Level 1 charger plugs into a standard 120-volt outlet. It charges slowly, but it rarely changes the panel picture, though a dedicated outlet circuit is a good idea.