When adding solar or a battery means upgrading your main panel

By Ally Electric & Solar, family-owned in Richmond since 2002

Short answer

Solar and batteries connect to your main panel, and the panel's busbar can only accept so much extra current. If the system is larger than the busbar allows, the options are a smaller main breaker, a connection ahead of the main breaker, or a main panel upgrade. Older or failing panels, and Federal Pacific or Zinsco panels, are usually replaced either way.

Ally has installed solar since 2010, and the main panel is the first thing we check on every solar or battery job. Here's why it matters and what the choices are.

The busbar limit

A panel's busbar is rated for a certain current, often the same as the main breaker. When solar feeds power back through a breaker in the same panel, the electrical code limits how much can be added. A common version of the rule allows the main breaker plus the solar breaker to total up to 120% of the busbar rating, with the solar breaker at the opposite end from the main.

On a 200A busbar with a 200A main, that leaves room for a 40A solar breaker. On a 100A panel, the room is much smaller, which is why older homes often hit the limit.

Options when the system is too big for the panel

Reduce the main breaker. If the home's load calculation allows it, a smaller main breaker frees up room on the busbar.

Connect ahead of the main breaker. A supply-side connection bypasses the busbar limit, where the panel and utility equipment allow it.

Upgrade the main panel. When the panel is old, full, or already marginal for the home's loads, replacing it is often the cleaner long-term answer, and it's the right time to go to 200A if you're electrifying.

Batteries and backup

A home battery adds its own connection and, for backup, equipment that separates the home from the grid during an outage. Whole-home backup and partial backup of selected circuits need different panel layouts, and the choice affects whether a panel upgrade makes sense.

PG&E interconnection

Every solar and battery system needs PG&E permission to operate before it's switched on. If a main panel upgrade is part of the job, the service upgrade and the interconnection application are coordinated so the home isn't waiting on two separate PG&E processes longer than necessary.

Common questions

Does adding solar always require a panel upgrade?

No. Many homes with a 200A panel in good condition can connect a typical residential system without one. Smaller or older panels, and Federal Pacific or Zinsco panels, more often need work first.

Should I upgrade my panel before or with solar?

Usually with it, as one project and one permit, so PG&E work and inspections are coordinated. If you're planning solar in the next year or two, mention it when getting a panel quote.